Set Week Starts On in Settings → System → Billing Address so the Timesheets week starts on your pay day, for example Friday to Thursday.

Written by Vladimir

Use this article to make the Easy Truck Shop Timesheets week start on the same day as your pay week — for example Friday to Thursday. The first day of the week is a setting called Week Starts On, found under Settings → System → Billing Address. Change it once and the Timesheets grid runs on your week from then on.

Can I change the start day of the week?

Yes. The start day of the week in Easy Truck Shop is set by Week Starts On in Settings → System → Billing Address. You can pick any day from Sunday to Saturday. A shop that pays Friday to Thursday sets Week Starts On to Friday.

How do I change the start day of the week?

To set the day your week starts on:

  1. Click your name and photo in the top right corner, then click Settings.

  2. Click the System tab at the top of the Settings page.

  3. In the menu on the left, click Billing Address.

  4. Click the Week Starts On box and pick the first day of your pay week, for example Friday.

  5. Click Update at the bottom of the form.

To check it worked, open TimeSheets from the same profile menu. The first column on the Timesheets grid is now the day you picked.

Where is the Week Starts On setting? In the picture below: 1 = the System tab. 2 = Billing Address in the left menu. 3 = Week Starts On. 4 = the Update button.

The Easy Truck Shop Settings page on System, Billing Address, with the System tab as 1, Billing Address in the left menu as 2, the Week Starts On box set to Thursday as 3, and the Update button as 4.

What does the Timesheets grid look like after I change the start day?

After you change Week Starts On, the Timesheets grid shows seven days starting on the day you picked, and the ‹ and › arrows move one of your weeks at a time. In the example below the shop set Week Starts On to Thursday, so the week runs Thursday, September 24 to Wednesday, September 30, 2026. With Friday the grid would run Friday to Thursday.

What does a Timesheets week starting on Thursday look like? In the picture below: 1 = the day columns, now Thursday to Wednesday. 2 = the week shown, Sep 24th - Sep 30th 2026.

The Easy Truck Shop Timesheets grid with Week Starts On set to Thursday, showing day columns Thu 24 Sep to Wed 30 Sep as 1 and the week title Sep 24th - Sep 30th 2026 as 2.

How do I get timesheet hours for a two-week pay period or other dates?

The Timesheets grid always shows one week. For a two-week pay period, or any other dates, use the download button on the Timesheets tab:

  1. Open TimeSheets from your profile menu. You land on the Timesheets tab.

  2. Click the download button in the top right corner, next to This week. The Export Timesheets window opens.

  3. Click From and pick the first day of the pay period.

  4. Click To and pick the last day.

  5. Click Download. Easy Truck Shop saves an Excel file with the hours for those dates only.

Example: for Friday, September 18 to Thursday, September 24, 2026, set From to 09/18/2026 and To to 09/24/2026, then click Download. The quick buttons — This Week, Last Week, This Month, Last Month and This Year — fill in both dates for you.

How do I pick dates in Export Timesheets? In the picture below: 1 = From. 2 = To. 3 = the quick buttons. 4 = Download.

The Export Timesheets window with From set to 09/18/2026 as 1, To set to 09/24/2026 as 2, the This Week, Last Week, This Month, Last Month and This Year quick buttons as 3, and the Download button as 4.

⚠️ You cannot pick a date in the future in Export Timesheets. Days after today are greyed out, so export a pay period once it has ended. If the To date comes before the From date, the window shows a red message and will not download until you fix it.

How do I see mechanic efficiency for my pay week?

The Efficiency and Productivity (beta) tabs open on Last 30 Days. To see one pay week, click the date box at the top left, click the first day of the week in the left calendar (From), click the last day in the right calendar (To), then click Select. The range resets to Last 30 Days when you switch between Efficiency and Productivity, so set it again on each tab.

How do I pick a custom date range on the Efficiency tab? In the picture below: 1 = the date box. 2 = From. 3 = To.

The Efficiency tab date box open, with the date box as 1, the From date 09/18/2026 in the left calendar as 2, and the To date 09/24/2026 in the right calendar as 3.

What each Efficiency and Productivity number means is explained in Where do I check mechanic reports?.

What Week Starts On does NOT do

  • It does not change any clocked hours. It only changes which day the Timesheets week starts on.

  • It is not set per mechanic. Week Starts On is one setting in Billing Address.

  • It does not run payroll. Easy Truck Shop gives you the hours; pay is done in your payroll system.

Who can change the start day of the week?

To change Week Starts On you need the Manage Team Settings permission, which puts Billing Address on the System tab. It also needs Manage Service Settings and Manage Invoice Settings so the Settings menu and System tab open. If you do not see Billing Address, ask your shop owner to turn these on. Seeing the Timesheets grid needs View and Edit Timesheets, and the Efficiency and Productivity tabs need View Efficiency.

Other ways shops ask this

  • "Is there a way to change the week? Our week is Friday to Thursday." → Yes. Settings → System → Billing Address → Week Starts On → Friday → Update.

  • "Can I change the start day of the week?" → Yes, with Week Starts On in Settings → System → Billing Address.

  • "How do I make timesheets start on Friday?" → Set Week Starts On to Friday in Settings → System → Billing Address, then click Update.

  • "Why does my timesheet week start on Monday?" → Week Starts On is set to Monday. Change it in Settings → System → Billing Address.

  • "Where is the week start setting?" → Settings → System → Billing Address → Week Starts On.

  • "I don't see Billing Address in Settings." → You need the Manage Team Settings permission.

  • "How do I get hours for a two-week pay period?" → Timesheets → download button → set From and To → Download.

  • "Can I see tech efficiency for my pay week?" → Efficiency → date box → pick From and To → Select.

Related articles

Did this answer your question?