Clocking in and out of a service or work order
Clocking into a job records your time against that service item, so the shop can see how long the work actually took and bill it. This article shows a technician how to start a job, pause it, and finish it.
This is not the same as clocking in for your shift. The shift clock in the top bar says you are at the shop; the job clock on the service item says what you are working on. They run separately — see How do I clock in, take a break, and clock out? for the shift clock.
Step 1: Open the Services tab
Go to the Services tab to see the open work orders assigned to you.
Step 2: Open the job and start it
Click the service you are going to work on, then find the service item you are doing. Click Start on that item (older versions of the app called this Start Service, or Start Inspection on an inspection).
When you start the item:
The item status changes from Not Started to In Progress.
Your name gets an In Progress badge in the item's Technicians list.
The Start button becomes Pause, next to Complete.
The activity log records "Clocked into <item name>" with the time.
There is no Start button on my job
You have to be assigned to the service item before the Start button appears. On the item, open Technicians, type your name into Assign Technician and click Assign. You will see "User is assigned to the item", and Start appears next to Complete.
If your name does not come up in the search, you need Can be Assigned to Services turned on for your user — see Permission: Assign users to Services.
Step 3: Enter the starting mileage if you are asked
If the unit is tracked by mileage or hours, enter the current reading when you start the service.
Step 4: Work the job, and pause if you need to
Click Pause if you have to stop and come back later — waiting on a part, moving to another truck, going to lunch. Pausing records "Clocked out of <item name>" in the activity log and the button goes back to Start. Click Start again when you pick the job back up; you can start and pause as many times as you need and the time adds up.
Pausing does not change the item's status — it stays In Progress — and it does not clock you out of your shift. The clock in the top bar keeps running.
Step 5: Complete the job
When the work is finished, click Complete. That stops the job clock and closes the item.
You will be asked for the Cause and Correction — what was wrong and what you did about it. These print on the customer's invoice.
If the shop uses Post-Service Tasks, such as a final truck check, they appear now. Complete them as needed.
If there are no tasks, finishing the service takes it off your list.
Where the time goes
Time you log on a job lands in three places:
On the service item itself, as the elapsed timer next to the estimated duration.
On the Technicians tab of the service, as your Hours.
On the shop's Timeline, as a dark blue bar on your row — see What do the blue bars on the mechanic Timeline mean?
Once the item is marked Complete, those hours also feed the Efficiency tab and go onto the invoice as billable labor on a time-based job.
What clocking into a job does NOT do
It does not clock you in for your shift. The timer in the top bar is separate. Starting a job when you are not clocked in leaves your timesheet empty for the day even though the work is recorded.
Pausing does not stop your shift clock. Clock out of a job and the shop clock keeps running — that time becomes idle time, not job time.
It does not change the item status back. Once started, the item stays In Progress until you Complete it.
It does not set the price on a flat-rate job. On flat rate the customer is billed the book time whatever the clock says — see Flat Rate vs Time-Based Billing.
You cannot edit your own logged time. Fixing a time log needs the Edit time on Service Items permission, which is normally a manager.
Other ways shops ask this question
"How do I clock in on a job?" → Open the service, find your item, click Start.
"How do I clock out of a work order?" → Click Pause to stop for now, or Complete when the work is done.
"Where is the Start Service button?" → It is now just Start, on the service item, and it only shows once you are assigned to that item.
"Why is there no Start button?" → You are not assigned to the item. Assign yourself under Technicians on that item.
"Can two mechanics work the same job?" → Yes. Assign both; each one starts and pauses their own time and both sets of hours are kept.
"Does clocking into a job clock me in for the day?" → No. They are two separate clocks.
"I clocked out of the job but my time is still running." → That is your shift clock in the top bar, which is correct behaviour. Clock out there when you leave.
"I forgot to clock in on the job." → A manager can add the time. See Permission: Edit time on Service Items.
Related
How do I clock in, take a break, and clock out? — the shift clock in the top bar.
Where do I check mechanic reports? — where all of this time shows up for the owner.



