How is efficiency counted when two mechanics work on one job?
When two or more mechanics are assigned to the same service item, EasyTruckShop splits the item's billed (invoiced) hours between them in proportion to the time each mechanic logged on that item. It is not a fixed 50/50 split.
Then each mechanic's efficiency is worked out on his own: his Invoiced Hours ÷ his Worked Hours.
Work order, service item and job mean the same thing here. Billed hours and Invoiced Hours mean the same thing. Logged time, job time and Worked Hours mean the same thing.
What is the formula for each mechanic's share?
Each mechanic's Invoiced Hours on an item = the item's billed hours × (his logged hours ÷ the total hours all mechanics logged on that item).
Each mechanic's Efficiency = his Invoiced Hours ÷ his Worked Hours.
Because the split follows the logged time, every mechanic on the same job always gets the same efficiency % for that job, even if one worked longer than the other. That % shows how the whole job went against its billed hours (total billed ÷ total time logged by everyone). Differences between mechanics show up across many jobs on the Efficiency report, not on one shared job.
Examples: a 2-hour PM with 2 mechanics
Tested on 18 Nov 2026 with an Oil Change PM billed at 2.0 hours at $100 per hour, and two mechanics, Mike and Mark, logging time on it.
What happened on the job | Mike worked | Mark worked | Billed hours each gets | Efficiency each |
Split evenly, 2 hours total (on the estimate) | 1 h | 1 h | Mike 1, Mark 1 | 100% and 100% |
One worked more, 2 hours total | 1.5 h | 0.5 h | Mike 1.5, Mark 0.5 | 100% and 100% |
Both went over the estimate, 4 hours total | 2 h | 2 h | Mike 1, Mark 1 | 50% and 50% |
Over the estimate and uneven, 4 hours total | 3 h | 1 h | Mike 1.5, Mark 0.5 | 50% and 50% |
Finished fast, 1 hour total (30 minutes each) | 0.5 h | 0.5 h | Mike 1, Mark 1 | 200% and 200% |
Only one mechanic logged time (the other is assigned but logged 0) | 0 h | 4 h | Mike 0, Mark 2 | Mike none, Mark 50% |
If 2 mechanics take 2 hours total on a 2-hour PM, what is each one's efficiency?
If each logged 1 hour, each gets 1 billed hour, so each is at 100%. The job is not cut in half against each mechanic's full time.
One mechanic worked more hours than the other. Is the one who worked less penalized?
No. The billed hours follow the time each one logged. On a 2-hour PM where one works 1.5 hours and the other 0.5 hours, they get 1.5 and 0.5 billed hours, and both show 100%.
What if both mechanics worked longer than the estimate?
The billed hours are still only the hours on the job. On a 2-hour PM where both work 2 hours (4 hours total), each gets 1 billed hour and each shows 50%.
One mechanic worked 3 hours and the other 1 hour on a 2-hour job. Does the slower one get a lower efficiency?
No. They took 4 hours together on a 2-hour job, so they get 1.5 and 0.5 billed hours and both show 50%. On one shared job, EasyTruckShop does not know who was faster; it only knows how long each one logged. The job as a whole took twice the billed time, so everyone on it is at 50%.
What if 2 mechanics finished a 2-hour job in 1 hour, 30 minutes each?
Each gets 1 billed hour for 0.5 hours worked, so each shows 200%.
What if a second mechanic is assigned but never logs any time?
He gets 0 billed hours for that job, and the mechanic who logged time gets all of them. Before anyone has logged time, the service's Technicians tab shows the hours split equally between the assigned mechanics; that changes as soon as time is logged.
How do I compare one mechanic against another?
Look at the Efficiency report over a longer date range, such as a week or a month, not at a single shared job. Each mechanic's percentage there combines all his completed jobs, including the ones he did alone, so the faster mechanic shows a higher number over time. Click a mechanic's row on the Efficiency tab to see his jobs one by one.
How does this show on the Efficiency report?
On TimeSheets → Efficiency, each mechanic's row adds up his Worked Hours and Invoiced Hours from every service item completed in the date range, then divides: total Invoiced Hours ÷ total Worked Hours. It is not an average of the job percentages.
Example from the same test day: Mike worked 5 hours across the first jobs above and was billed 4.5 hours, so he shows 90% and $450.00 Charged. Mark worked 4 hours and was billed 3.5, so he shows 88% and $350.00 Charged.
Where can I see each mechanic's share on one job?
Open the service and click the Technicians tab at the top. Each mechanic shows Hours (time he logged) and Invoiced Hours (his share of the billed hours) with his percentage. Click a mechanic's row to see the same numbers for each service item.
To change a mechanic's time on a job, open the service item, expand Technicians, click the mechanic's hours to open Edit Assignment, then use Add Time Log or click a log to edit or remove it. The report updates from the corrected time.
What to keep in mind
Only completed service items count on the Efficiency report.
Time logged on a job is not the same as clocked (shift) time. Efficiency uses job time; clocked time does not change it.
The split uses the time logged in EasyTruckShop. If a mechanic forgets to start or stop his job clock, his share will be wrong until the time is corrected.
There is no setting to split billed hours a different way, such as always 50/50 or by a percentage you choose.
Other ways shops ask this question
If I have a PM that pays 2 hours and 2 mechanics on it, how is efficiency counted per tech?
How does efficiency work with two techs on one job?
Does the system split the hours 50/50 between mechanics?
Two guys did one job, why does each show a different efficiency than I expected?
One tech worked 3 hours and the helper 1 hour on a 4-hour job, what is their efficiency?
Why do both my mechanics show the same efficiency on a job when one worked longer?
How are invoiced hours divided between technicians?
Is efficiency accurate when more than one mechanic is on a work order?
Why does my mechanic show 200% efficiency?
Related
Where do I check mechanic reports? — the Efficiency tab and what each card means.
A mechanic forgot to clock in — how do I fix their hours? — correcting job time.
